Factory friends sent us a few photos on the progress of the building of Two Fish. I will cede the 1,000 words to the photos. The big steps are done. The deck and the rear stairs are attached to the hull. Before the deck was put on, all of the large items needed to be installed. The engines, heads, water tanks and settees are too large to be brought into the boat through the door. Now that the deck is installed, if any of these items need to be replaced it will be like building a ship in a bottle. On some boats, if the engine needs to be replaced, a hole must be cut in the deck. Hope the engines last for decades.
- Need ports and windows
- Waiting for stainless steel
- Deck Being Attached
- Nav station
- Sugar Scoops
UPDATE, Thanks to the crew of hull #48 we have some great progress shots from mid march. Thanks Peter and Sally.
- Secured in Alsina factory
- Two Fish ready for finishing
- Welcome aboard 44 – Chainplate installation
- New engine in place and protected
- Cockpit not ready for sundowners
6 Responses to Build Progress Update